Transportable home chalets where specified in the order can be constructed in compliance with BS 3632 Chassis alternatives (Engineers report provided at extra cost)
• (1) Transportable rigid chassis with lifting hooks and cross beam separators.
• As 1 above but Glue-Lam beams in lieu of rigid chassis.
• As 1 above but steel I beams in lieu of Glue-Lam beams.
• As 1 above but sitting on welded detachable steel lifting frame.
Floor
• Minimum ex 31mm Tongue and grooved boarding face screwed to ex 100 x 50 framing to reduce creak and allow easy subsequent access. A vapour barrier is fitted over the tanalised framework and 100mm of Crown Wool or polystyrene - U Value 0.37 W/m2 deg. C or Foil Tek Double – U Value 0.25 W/m2 K.
The floor is coated with Polyurethene Floor Varnish to enhance the appearance with rich clarity.
Exterior Walls
• Figs. 1 & 2 overleaf show Softwood 50/70mm double/triple finger interlocking joint along the full length of each log.
Fig. 1 fig. 2
• Wallboards insulated and studded with Phenolic foam and foil board, Studding and match boarding or insulated plasterboarding • At each corner the wood is machined with a weather resistant cross-halved joint, which adds extra rigidity to the structure (see figs 3 & 4 below).
The external walls are coated with a combination of Butinox 1, this comes in a large selection of standard and non-standard colours. It provides additional fungicide, insecticide & UV protection. Two coats of Butinox 4 clear are then applied which gives a UV & weather shield. Every 5/6 years one further coat of Butinox 4 will be required to maintain the external finish (see manufacturers details).
Interior Walls
• Softwood 50/70mm double/triple finger interlocking joint along the full length of each log. At each corner the wood is machined with a weather resistant cross-halved joint, which adds extra rigidity to the structure.
• The use of integral partition walls as part of the building footprint adds to the rigidity of the dwelling.
Roof
• Support comprises one full-length ridge purlin and intermediate (mid-span) purlins.
• Above the purlins 18mm thick stress relieved tongue & grooved roofboards are fixed. These attractively finished boards are visible from the inside of the cabin and provide a finish contemporary to the rest of the cabin.
• Above the roofboards Thermaroof TR31 (Aerodeck) or Celotex Tempchek Deck TD2000 (which is a rigid closed cell foam with two skins of reflective foil) between 50 x 50mm or 50 x 100mm R/S carcassing and 18 - 25mm plywood board laminated on one side is fitted. U Value 0.32 W/m2 K. Higher levels of insulation are available at extra cost.
• Above the plywood a single skin of Foil Tek or `Protect 300` is fitted as a membrane, waterproof barrier and second line of defence.
• The final coat is a double layer of glass fibre reinforced bituminous felt rectangular shingles which have a 15 year warranty and achieve a fire rating of: Ext. S.A.A. Colour choice: Slate grey, Two tone red, Brown and Green.
Roof Overhangs
• Large roof overhangs of 250mm or more at the eaves protect the wall logs from adverse weather.
• Apex overhangs do the same as above and offer cabins with integral balconies further protection when the weather becomes stormy.
• Overhangs offer additional protection to the occupants from the hot summer sun.
• In wintertime when the azimuth of the sun is lower rays can penetrate under the Eaves to supply welcome warmth and light.
Windows
• Unless stated otherwise, windows are fitted with High performance nominal 26mm double glazed units.
• Reduced joinery outward opening tilt and turn inward opening casement/fixed light combinations as illustrated in fig 5.
• Casements are fitted with a Single compressible high performance weatherseal.
• Windows are treated with an optional preservative. Shutters are fitted as an optional extra (see price list).
Doors
• High performance toughened nominal 26mm double glazed safety units fitted with a 5-year warranty into reduced joinery frames and leaves.
• Door leaves are fitted with external grade finished heavy butt hinges five lever door lock, handle and Euro type cylinder.
• Casements are fitted with Single compressible high performance weatherseal.
• Doors are treated with an optional extra preservative (see price list). Shutters are fitted as an optional extra (see price list).
General Specification
• Pre-treatment of timber with Borax water repellant, anti-fungal agent and insect
• Repellant – Control of Pesticides Regulations 1986 HSE No. 5687, BBA Certificate number 93/2893 (Second issue 1998). Disodium Ocoborate Tetrahydrate Na2 B8 O13 .4H2O
• Windows & Doors may be made compliant with BS6262 & 6206.
• Where applicable (optional package) Gas flues can be fitted in accordance with BS5440.
• Where applicable timber products will be treated in accordance with BS5589.
• Where applicable services will be specified and installed in accordance with BS6762.
• If required (for instance in public buildings) the timber surface can be coated with a clear intumescent fire resisting varnish. This coating is costly and would not normally be required as timber is capable of retaining its structural integrity for long period in fire.
• Electrical wiring and fittings installed to IEE standard (optional package).
• Electric water heating system. Gas or Oil alternatives if required (optional package).
• Heating via Low Wattage panel heaters in living areas (optional package).
• TV point and telephone point (where appropriate) to living area (optional package).
• Smoke detectors (optional package).
Standards and Build Specification for optional turnkey package.
Choose and quantify from the list and we can provide an additional price.
Kitchen
• Units from Pine or Gallery style range as per plans incorporating Kitchen sink and Single Drainer.
Appliance pack provided by arrangement.
Lounge
• Surround, hearth, base and electric or gas fire. Bathrooms
• Queen Anne Suite bathroom range or similar.
• Bath with mixer taps and rose attachment OR Shower cubicle with electric shower.
• Wash Hand Basins complete with taps and fitted with support brackets. Alternative pedestal if required.
• Towel rail, Toilet Roll Holder, Cup Holder by arrangement.
Bedrooms
• Wardrobes, Dressing Table, Bedside Cabinet in the Shreiber Range or Similar.
Optional packs :-
Appliance Pack
• Electric Oven and Hob or Gas alternative available.
• Dishwasher
• Fridge Freezer
• Washing Machine
Furniture and Fitting Pack (Specify quantity)
• Wardrobe
• Dressing Table, Stool and Mirror
• Bedside Cabinet
• Pine Dining Table and Chairs
• Pine Coffee Table
• Coat Hooks
• Bathroom Cabinet
• Soap Dish, Toothbrush Cup and Holder with Cup, Toilet Roll Holder
• Electric Towel Rail
Furnishings Pack
• Vinyl floor covering and vertical blinds to the kitchen and bathroom floors, Carpet, Curtain Rails and Contrasting Curtains to Living Areas and Bedrooms
• Choice of light fittings and Shades. • Kitchen and Bathrooms – Vinyl Floor and Roller Blind
• Lounge Three Piece suite with bed settee alternative and scatter cushions, Coffee table.
• Bedrooms - Divan Double or Single Beds or Bunk Bed alternative.
M & E Specification
Electrical installation comprises:
• 10 Way Isolator • 7no wall switches
• 8no Double sockets
• 3no Convector sockets
• 1no Cooker switch
• 1no Bathroom light
• 2no Bedroom lights
• 1no light in the living area
• Strip light in the Kitchen
• External light
• 2no wall mounted convector heaters in the bedrooms.
• 1no wall mounted fan heater in bathroom.
• 1no wall mounted convector heater in living area.
• 1no Smoke alarms
• Electric hob
• Hood
• Fan oven
Plumbing installation comprises:
• 15 Litre 2.2Kw water heater with expansion vessel, pressure reducer & non-return valve
• 1no WC with integral overflow
• 1no wash basin with hot & cold taps
• 1no shower base and cabinet
• Electric Power Shower
• Kitchen sink with integral drain board, hot & cold taps
• Internal carpentry fit out suggestion comprise:
• 2no 3 x 2m kitchen unit with one double wall unit
• Wall Cupboard above sink
• Wall cupboard for fan
• Vanity unit
Usually the customer has this done but, Sewer and water connection usually comprises:
• Form 100mm connection to existing sewer.
• Provide and lay 100mm-diameter pipe from connection to the new building.
• Construct inspection chambers.
• Reinstate road and drive.
• Provide and lay 25mm diameter water pipe from new building to existing main.
• Attend on connection to main by Water Authority.
• Traffic management
• Water connection by Water Authority.
Note: We are pleased to vary the packages to customer's own specified requirements.